No, not this time. This time, Colin's buying two pallets loaded down with construction materials. Pipes, fasteners, valves, granite sheets, boards, and anything else that could possibly be required for the kitchen redesign Rin's got him doing.
Yep, just two pallets of construction-ready materials. Nothing more to see here.
no subject
Change: Is he buying ANOTHER building?
No, not this time. This time, Colin's buying two pallets loaded down with construction materials. Pipes, fasteners, valves, granite sheets, boards, and anything else that could possibly be required for the kitchen redesign Rin's got him doing.
Yep, just two pallets of construction-ready materials. Nothing more to see here.
Day: Day 188
Cost: 300