Change: A small building that will house a food preservation and storage facility. This is a one story building, and will be located adjacent to the Bastion's barn for ease of access.
The building itself houses automated equipment, controlled via simple control panel, with which the inhabitants of the Bastion can put in surplus food for canning. There will also be climate controlled storage space for all of the canned foods, ensuring that everything is kept in the most optimal conditions for preservation.
Additionally, there will be a decently sized meat locker to keep meat refridgerated. Between the fish, the mammoths, and Colin's other building purchase, the Bastion will likely have more meat than they know what to do with. The meat lockers will ensure that this meat lasts as long as possible.
There will be walkways for accessing the equipment, the locker, and the storage room. There will be very little room for anything else in this building, as the equipment will take up a majority of the space. The only seat in the building will be a chair at the control panel, in case anyone needs to spend extra time working at it.
no subject
Date: 2014-05-11 03:55 am (UTC)Change: A small building that will house a food preservation and storage facility. This is a one story building, and will be located adjacent to the Bastion's barn for ease of access.
The building itself houses automated equipment, controlled via simple control panel, with which the inhabitants of the Bastion can put in surplus food for canning. There will also be climate controlled storage space for all of the canned foods, ensuring that everything is kept in the most optimal conditions for preservation.
Additionally, there will be a decently sized meat locker to keep meat refridgerated. Between the fish, the mammoths, and Colin's other building purchase, the Bastion will likely have more meat than they know what to do with. The meat lockers will ensure that this meat lasts as long as possible.
There will be walkways for accessing the equipment, the locker, and the storage room. There will be very little room for anything else in this building, as the equipment will take up a majority of the space. The only seat in the building will be a chair at the control panel, in case anyone needs to spend extra time working at it.
Day: Day 188
Cost: 300